Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Jining Hongye Chemical Co

Alkyd paints, acrylic paints, polyurethane paints, road marking paints, epoxy...

sell
  • There is no classification
contact
  • Contact:闫先生
  • Phone:13287226774
  • Email:15106730220@163.com
search
 
link
  • There is no link yet
home > sell > Jiashen acrylic paint professional manufacturer
Jiashen acrylic paint professional manufacturer
products: Views:5Jiashen acrylic paint professional manufacturer 
brand: 嘉神
price: 面议
MOQ: 1 桶
Total supply: 10000 桶
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2015-09-05 08:42
 
Details
Acrylic paint is mainly formulated from acrylic resin extender, pigment additives, organic solvents, etc.
Features
The acrylic topcoat is wear-resistant, water-resistant and corrosion-resistant, and has excellent weather resistance. The paint is brightly colored and has excellent decorative properties. Usage
Acrylic topcoat is widely used for surface decorative coating of vehicles, engineering machinery, etc. It can also be used for parts above the waterline of ships and other offshore facilities, steel bridges, beams, etc.
Technical requirements
Various colors
Flash point ℃
Drying time ℃ Surface dry minutes Solid drying hours
Paint film thickness Wet film microns Dry film about microns
Theory The amount of paint used is about/
The painting interval is ℃ hours
The recommended number of coats of dry film is about microns
Thinner Acrylic paint thinner
Epoxy paint for front paint Chlorinated rubber-like primer
The coating method can be selected according to different situations: brushing, roller coating, airless high-pressure spraying
Surface treatment
The paint film on the surface of the object to be coated is intact, and there is no water, oil, dust, etc. , if the primer exceeds the interval, it should be roughened.
Construction conditions
Construction can be carried out when the steel surface temperature is higher than the dew point temperature of the surrounding air. Construction cannot be carried out when the relative humidity is higher than the dew point temperature of the surrounding air.
The construction temperature is ℃. Construction under rain, snow, fog, frost, dew and strong wind conditions is strictly prohibited.
Contact number
Request for quotation
A total of0articles  Related Comments: